Client:
Gateway South JV
Gateway South JV link opens in a new tab
Project Owner:
Department of Planning, Transport, and Infrastructure (DPTI) - South Australia
Department of Planning, Transport, and Infrastructure (DPTI) - South Australia link opens in a new tab
The Darlington upgrade project
Part of South Australia’s ambitious North-South Corridor initiative, is transforming approximately 3.3 km of Main South Road. This significant redevelopment aims to enhance the region through reduced travel times and increased freight transport efficiency.
Ground-Based Monitoring Implementation
- At Sixense Satellite, we have been instrumental in providing sophisticated monitoring solutions for a segment of this project. Our role involved delivering an array of monitoring sensors and a data acquisition system.
- These were deployed with our experts offering remote assistance for seamless installation and operation.
Satellite Deformation Monitoring
- We conducted an Atlas-InSAR satellite radar interferometry study over an expanse of around 3.4 km².
- This advanced technique allowed us to meticulously track deformation across the project area, enabling the collection of vital data on background movements and settlements.
Cyclops (ATS)
InSAR measurement points
Tiltmeters
Monitoring prisms
High-resolution TerraSAR-X images