Client:
Gateway South JV
Gateway South JV link opens in a new tab
Project Owner:
Department of Planning, Transport, and Infrastructure (DPTI) - South Australia
Department of Planning, Transport, and Infrastructure (DPTI) - South Australia link opens in a new tab
The Darlington upgrade project
Part of South Australia’s ambitious North-South Corridor initiative, is transforming approximately 3.3 km of Main South Road. This significant redevelopment aims to enhance the region through reduced travel times and increased freight transport efficiency.
Ground-Based Monitoring Implementation
- At Sixense Satellite, we have been instrumental in providing sophisticated monitoring solutions for a segment of this project. Our role involved delivering an array of monitoring sensors and a data acquisition system.
- These were deployed with our experts offering remote assistance for seamless installation and operation.
Satellite Deformation Monitoring
- We conducted an Atlas-InSAR satellite radar interferometry study over an expanse of around 3.4 km².
- This advanced technique allowed us to meticulously track deformation across the project area, enabling the collection of vital data on background movements and settlements.
InSAR measurement points
High-resolution TerraSAR-X images
Monitoring prisms