Skip to content Transforming your infrastructure into living assets

Darlington upgrade project

Service provided:
Real-time, post construction remote monitoring.
Location:
Darlington SA, Australia
Period of the service:
2021 - 2025
Sixense expertise used:

The Darlington upgrade project

 

Part of South Australia’s ambitious North-South Corridor initiative, is transforming approximately 3.3 km of Main South Road. This significant redevelopment aims to enhance the region through reduced travel times and increased freight transport efficiency.

 

 

Ground-Based Monitoring Implementation

  • At Sixense Satellite, we have been instrumental in providing sophisticated monitoring solutions for a segment of this project. Our role involved delivering an array of monitoring sensors and a data acquisition system.
  • These were deployed with our experts offering remote assistance for seamless installation and operation.

 

Satellite Deformation Monitoring

  • We conducted an Atlas-InSAR satellite radar interferometry study over an expanse of around 3.4 km².
  • This advanced technique allowed us to meticulously track deformation across the project area, enabling the collection of vital data on background movements and settlements.

Images of the project

62,800

InSAR measurement points

55

High-resolution TerraSAR-X images

170

Monitoring prisms

Tags

Road Transport Monitoring

Do you need to speak to an expert? Contact us